Product status · 2 October 2026

Progress you can assess.

Current delivery, continuing development and longer-term vision require different kinds of evidence.

Dated checkpoint · Android 4.49 / build 195
A checkpoint with inspectable scope.Beautified product visualization · example data
DELIVERY / SCOPE / NEXT PROOF

Android 4.49 / build 195

Native capture provenance ↗
Android 4.49 / build 195Current scopeCurrent recorded delivery and bounded checks
Graph and photo interactionsCurrent scopeCurrent within demonstrated test scope
Supported physical probe field loopIn developmentIn development; exact-combination acceptance required
Source-backed equipment cardsIn developmentIn development; exact-model coverage incomplete
Durable visits and baseline guidanceIn developmentIn development; tested candidate not deployed
Camera, Vacuum Buddy and Charge BuddyIn developmentIn development; complete field readiness not established
Office workspace and integrationsPlannedPlanned; future delivery and access required
Dated product checkpoint from the supplied brief. Native delivery, bounded tests, physical acceptance and planned capabilities remain distinct.

Product status / IN DEPTH

The work behind the interface.

Purpose, prerequisites and the evidence that belongs to the task.

HVAI’s October white paper distinguishes three states. Current means included in the latest recorded Android delivery or demonstrated within the stated test scope. In development means active work or a defined workflow whose complete field readiness is still being established. Planned means a longer-term direction dependent on future delivery, validation, permissions or integration access. These labels keep a product vision separate from a universal availability or acceptance claim.

01

Current

Android version 4.49, build 195 includes Profile, header, graphs, archived-circuit and onboarding work. Recorded build checks and bounded UI tests passed. Graph interaction, the onboarding demo journey and a controlled photo-carousel test were demonstrated.

02

In development

Physical probe acceptance, source-backed equipment cards, durable visits and broader baseline guidance remain unfinished. Camera and Buddy workflows have defined directions, while complete physical and end-to-end readiness is still being established.

03

Planned

The broader office workspace, authorized company visibility, company roles, additional adapters and cross-platform expansion depend on future delivery and access. No live third-party integration is implied.

THROUGH THE TASK

Keep the context
at each step.

Open a step to inspect what needs to stay clear.

01Keep evidence types separate

Source checks establish applicable facts. Builds establish that code passes declared checks. Installed runtime and physical hardware acceptance establish different, additional claims.

02Test the whole task

The next proof is correct identity, valid circuit readings, clear interpretation, saved evidence and reliable reopen on declared equipment and tools.

03Exercise interruptions

Camera behavior, connection loss, offline persistence and synchronization need explicit acceptance. A favorable interface demonstration cannot establish each of these outcomes.

04Update the public record

Future progress should be described with a date, declared scope and supporting evidence. A roadmap direction is not a delivery commitment.

STATUS & EVIDENCE

This is a checkpoint, not a launch announcement.

The brief announces neither general availability nor universal compatibility, completed OEM coverage or a deployment date. A separately tested durable-measurement and versioned-guidance candidate was not deployed at this checkpoint. Live durable cloud synchronization is not claimed.